How To Fix PMRP014 - Valid-from date &1 must be earlier than valid-to date &2


PMRP014 - Overview

  • Message type: E = Error

  • Message class: PMRP - Messages for pMRP

  • Message number: 014

  • Message text: Valid-from date &1 must be earlier than valid-to date &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMRP014 - Valid-from date &1 must be earlier than valid-to date &2 ?
    The SAP error message PMRP014 indicates that there is an issue with the validity dates in a planning or master data context, typically related to a material or resource in the SAP system. The message states that the "valid-from date" must be earlier than the "valid-to date." This error often occurs in scenarios involving planning data, such as in the context of production planning, material requirements planning, or maintenance planning.
    
    Cause: The error is triggered when the system detects that the "valid-from" date (the date from which the data is applicable) is set to a date that is equal to or later than the "valid-to" date (the date until which the data is applicable). This creates a logical inconsistency, as a validity period cannot start after it ends.
    Solution: To resolve this error, you need to check and correct the validity dates in the relevant master data or planning data. Here are the steps

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant