How To Fix PMMO_PEG_BRKPT_MAINT005 - Project (&1) was changed to &2 to match the requirement WBS element


PMMO_PEG_BRKPT_MAINT005 - Overview

  • Message type: E = Error

  • Message class: PMMO_PEG_BRKPT_MAINT - Messages about Pegging breakpoint maintenance

  • Message number: 005

  • Message text: Project (&1) was changed to &2 to match the requirement WBS element

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMMO_PEG_BRKPT_MAINT005 - Project (&1) was changed to &2 to match the requirement WBS element ?
    The SAP error message PMMO_PEG_BRKPT_MAINT005 indicates that there is a discrepancy between the project definition and the requirements of the Work Breakdown Structure (WBS) element. This typically occurs in the context of project management and planning within SAP, particularly when dealing with project structures and their associated elements.
    
    Cause: The error message is triggered when: A project (or a project element) has been modified in a way that it no longer aligns with the requirements of the WBS element. The project was changed to a different status or type that does not match the expected configuration for the WBS element. There may be inconsistencies in the project hierarchy or structure that violate the rules set for project management in SAP.
    Solution: To resolve this error, you can take the following steps: Check Project and WBS Configuration: Review the project settings and ensure that they are correctly configured to match the requirements of the WBS element. Verify that the project type,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker