Do you have any question about this error?
Message type: E = Error
Message class: /PMG/GE_ENH -
Message number: 088
Message text: Sync started from Parent MP to Child MP with id: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PMG/GE_ENH088
- Sync started from Parent MP to Child MP with id: &1 ?The SAP error message
/PMG/GE_ENH088 Sync started from Parent MP to Child MP with id: &1
typically relates to issues in the context of the SAP Project Management (PM) module, particularly when dealing with the synchronization of data between a parent and child project or task.Cause:
- Data Synchronization Issues: This error often arises when there is a problem with the synchronization process between a parent project (MP) and its child project (MP). This could be due to inconsistencies in data, missing data, or issues with the configuration of the project management settings.
- Configuration Errors: Incorrect settings in the project management configuration can lead to synchronization problems.
- System Performance: If the system is under heavy load or if there are performance issues, it may affect the synchronization process.
- Authorization Issues: Lack of proper authorizations for the user trying to perform the synchronization can also lead to this error.
Solution:
- Check Data Consistency: Ensure that all necessary data in both the parent and child projects is complete and consistent. Look for any missing or incorrect entries.
- Review Configuration Settings: Verify the configuration settings for project management in your SAP system. Ensure that they are set up correctly for parent-child relationships.
- Monitor System Performance: Check the system performance and load. If the system is slow, consider optimizing performance or scheduling synchronization during off-peak hours.
- Authorization Check: Ensure that the user has the necessary authorizations to perform synchronization tasks. You may need to consult with your SAP security team to verify this.
- Logs and Traces: Check the application logs and traces for more detailed error messages that can provide additional context on what might be causing the synchronization issue.
- SAP Notes and Support: Look for any relevant SAP Notes that might address this specific error. SAP frequently releases updates and patches that can resolve known issues.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/PMG/GE_ENH087
Issue occurred with interval selection; interval &1 aborted.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PMG/GE_ENH086
FPP Interval started from MP id &1 to &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PMG/GE_ENH089
Issue occurred during sync to master policy &1; details: &2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PMG/GE_ENH090
Sync completed from Parent MP to MP with id: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.