How To Fix /PMG/GE_ENH062 - Creation of FPP Run to update policies, failed.


/PMG/GE_ENH062 - Overview

  • Message type: E = Error

  • Message class: /PMG/GE_ENH -

  • Message number: 062

  • Message text: Creation of FPP Run to update policies, failed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PMG/GE_ENH062 - Details

  • The SAP error message /PMG/GE_ENH062 Creation of FPP Run to update policies, failed typically occurs in the context of the SAP Product Lifecycle Management (PLM) or SAP Advanced Planning and Optimization (APO) modules, particularly when dealing with the Flexible Planning Process (FPP) or similar planning runs.
    
    Cause:
    Configuration Issues: There may be misconfigurations in the planning settings or parameters that are required for the FPP run. Data Issues: Missing or incorrect master data (like materials, resources, or planning data) can lead to failures in the planning run. Authorization Problems: The user executing the FPP run may not have the necessary authorizations to perform the action. System Errors: There could be underlying system issues, such as database connectivity problems or system resource limitations. Locking Issues: If another process is currently using the same data, it may lead to a lock situation, preventing the FPP run from completing.
    Solution: Check Configuration: Review the configuration settings for the FPP run. Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PMG/GE_ENH062 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker