How To Fix /PM0/FPP018 - Start of run &1 (time: &2)


/PM0/FPP018 - Overview

  • Message type: E = Error

  • Message class: /PM0/FPP -

  • Message number: 018

  • Message text: Start of run &1 (time: &2)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/FPP018 - Start of run &1 (time: &2) ?
    The SAP error message /PM0/FPP018 Start of run &1 (time: &2) typically relates to issues encountered during the execution of a planning run in the SAP system, particularly in the context of production planning and detailed scheduling (PP/DS). This message indicates that there was a problem starting the planning run, and it provides the run ID and the time at which the error occurred.
    Possible Causes:
    
    
    Configuration Issues: There may be incorrect settings in the planning run configuration or parameters that are not set correctly. Master Data Issues: Missing or incorrect master data (like material master, BOM, routing, etc.) can lead to errors during the planning run. Resource Availability: Resources (like machines or labor) may not be available or may be incorrectly defined in the system. Locking Issues: Another process might be locking the data that is required for the planning run. Insufficient Authorizations: The user executing the planning run may not have the necessary authorizations

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker