How To Fix /PM0/FPP018 - Start of run &1 (time: &2)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PM0/FPP -

  • Message number: 018

  • Message text: Start of run &1 (time: &2)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/FPP018 - Start of run &1 (time: &2) ?

    The SAP error message /PM0/FPP018 Start of run &1 (time: &2) typically relates to issues encountered during the execution of a planning run in the SAP system, particularly in the context of production planning and detailed scheduling (PP/DS). This message indicates that there was a problem starting the planning run, and it provides the run ID and the time at which the error occurred.

    Possible Causes:

    1. Configuration Issues: There may be incorrect settings in the planning run configuration or parameters that are not set correctly.
    2. Master Data Issues: Missing or incorrect master data (like material master, BOM, routing, etc.) can lead to errors during the planning run.
    3. Resource Availability: Resources (like machines or labor) may not be available or may be incorrectly defined in the system.
    4. Locking Issues: Another process might be locking the data that is required for the planning run.
    5. Insufficient Authorizations: The user executing the planning run may not have the necessary authorizations to perform the action.
    6. Technical Issues: There could be underlying technical issues, such as database problems or system performance issues.

    Solutions:

    1. Check Configuration: Review the configuration settings for the planning run. Ensure that all necessary parameters are correctly set.
    2. Validate Master Data: Ensure that all relevant master data is complete and accurate. Check for missing materials, BOMs, routings, or any other required data.
    3. Resource Check: Verify that all resources required for the planning run are available and correctly defined in the system.
    4. Check Locks: Use transaction codes like SM12 to check for any locks on the relevant data and resolve them if necessary.
    5. Authorization Check: Ensure that the user has the necessary authorizations to execute the planning run. This can be checked in transaction SU53 or by consulting with your security team.
    6. Review Logs: Check the application logs (transaction SLG1) for more detailed error messages that can provide additional context on the issue.
    7. System Performance: If the issue is related to system performance, consider checking system resources and performance metrics.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • MD01: Total Planning
      • MD02: Single-item, Multi-level Planning
      • MD04: Stock/Requirements List
      • SLG1: Application Log
      • SM12: Display and Delete Locks
      • SU53: Authorization Check
    • SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address specific issues related to this error message.
    • Documentation: Review SAP documentation related to PP/DS and planning runs for best practices and troubleshooting steps.

    If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker