How To Fix /PM0/ALB_MESSAGES529 - The first due date for &1 must be after the free look period


/PM0/ALB_MESSAGES529 - Overview

  • Message type: E = Error

  • Message class: /PM0/ALB_MESSAGES -

  • Message number: 529

  • Message text: The first due date for &1 must be after the free look period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PM0/ALB_MESSAGES529 - Details

  • The SAP error message /PM0/ALB_MESSAGES529 indicates that there is an issue with the scheduling of a maintenance plan or a similar process where the first due date is set incorrectly in relation to the free look period. This error typically arises in the context of maintenance planning and scheduling within the SAP PM (Plant Maintenance) module.
    
    Cause: The error occurs when the first due date for a maintenance task or plan is set to a date that falls within the free look period. The free look period is a predefined time frame during which no maintenance activities are scheduled or expected to occur. This is often used to allow for a grace period before the first maintenance task is due.
    Solution: To resolve this error, you need to adjust the first due date of the maintenance plan or task so that it is set to a date that is after the end of the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PM0/ALB_MESSAGES529 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author