How To Fix /PM0/ALB_MESSAGES509 - Maximum percentage reached for &1. Execute total shift (coverage &2)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PM0/ALB_MESSAGES -

  • Message number: 509

  • Message text: Maximum percentage reached for &1. Execute total shift (coverage &2)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ALB_MESSAGES509 - Maximum percentage reached for &1. Execute total shift (coverage &2) ?

    The SAP error message /PM0/ALB_MESSAGES509 indicates that the maximum percentage for a specific coverage has been reached in the context of the Advanced Planning and Optimization (APO) module, particularly in the context of planning and scheduling. This error typically arises when the system has reached the limit of how much of a resource or capacity can be allocated to a particular task or operation.

    Cause:

    1. Capacity Limitations: The error usually occurs when the total planned capacity for a resource exceeds the defined limits. This could be due to:

      • Over-allocation of resources.
      • Incorrect configuration of capacity settings.
      • Changes in demand that were not accounted for in the planning process.
    2. Planning Parameters: The planning parameters set for the specific resource or operation may not align with the actual requirements, leading to a situation where the maximum percentage of capacity utilization is reached.

    3. Coverage Settings: The coverage settings for the planning process may be too restrictive, causing the system to trigger this error when trying to allocate resources.

    Solution:

    1. Review Capacity Settings: Check the capacity settings for the resource in question. Ensure that the maximum capacity is set correctly and that it reflects the actual capabilities of the resource.

    2. Adjust Planning Parameters: Modify the planning parameters to allow for more flexibility in resource allocation. This may involve adjusting the maximum percentage of capacity that can be utilized.

    3. Execute Total Shift: The error message suggests executing a total shift. This means you may need to run a total shift operation to redistribute the workload across available resources. This can help in balancing the load and preventing over-utilization of any single resource.

    4. Analyze Demand and Supply: Review the demand and supply data to ensure that they are aligned. If there are discrepancies, adjust the planning accordingly.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling capacity-related errors in your version of SAP.

    6. Engage with SAP Support: If the issue persists, consider reaching out to SAP support for assistance. They can provide insights based on the specific configuration and version of your SAP system.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO that can help you analyze and adjust planning settings, such as /SAPAPO/SDP94 for planning book analysis.
    • Capacity Planning: Understanding the principles of capacity planning in SAP APO can help prevent such errors in the future.
    • User Forums and Communities: Engaging with SAP user communities can provide additional insights and solutions from other users who may have faced similar issues.

    By addressing the underlying causes and following the suggested solutions, you should be able to resolve the error and improve your planning processes in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author