Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ALB_MESSAGES -
Message number: 012
Message text: Error while entering option duration and/or option end
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ALB_MESSAGES012
- Error while entering option duration and/or option end ?The SAP error message
/PM0/ALB_MESSAGES012
typically occurs in the context of project management or planning when there is an issue with entering option duration or option end dates. This error can arise due to various reasons, and understanding the cause is essential for finding a solution.Possible Causes:
- Invalid Date Format: The date entered for option duration or end may not be in the correct format or may not comply with the system's date settings.
- Logical Errors: The option end date may be earlier than the option start date, or the duration may not align with the defined project timelines.
- Missing Required Fields: There may be other mandatory fields that need to be filled out before entering the option duration or end.
- Configuration Issues: There could be issues with the configuration settings in the project management module that are preventing the entry of valid dates.
- Authorization Issues: The user may not have the necessary permissions to make changes to the project or planning data.
Solutions:
- Check Date Format: Ensure that the dates are entered in the correct format as per the system's regional settings. For example, if the system expects dates in the format
DD/MM/YYYY
, ensure that you are following that format.- Validate Dates: Make sure that the option end date is after the option start date and that the duration is logically consistent with the project timeline.
- Complete Required Fields: Review the form or screen to ensure that all mandatory fields are filled out correctly before attempting to enter the option duration or end.
- Review Configuration: If you have access, check the configuration settings in the project management module to ensure that everything is set up correctly.
- Check Authorizations: Verify that you have the necessary permissions to make changes. If not, contact your SAP administrator to request the required access.
Related Information:
CJ20N
for project management or CJ01
for creating work breakdown structures.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ALB_MESSAGES011
Enter a valid option phase in months remaining (1-11)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ALB_MESSAGES010
Internal problem has occurred with constants for the payment form
What causes this issue? The system tried to calculate the annuity as per the <DS:GLOS.6F7FE2DE88F30B488ABBBE4822FC8ADE>payment frequency</&g...
/PM0/ALB_MESSAGES013
Enter the option end date or option duration
What causes this issue? You have not entered an option end or option duration, even though you have defined the type of guaranteed option.System Resp...
/PM0/ALB_MESSAGES014
Check the day and month for the annuity guarantee
What causes this issue? You have entered an annuity guarantee end day and/or month that does not agree with the annuity start date.System Response T...