Message type: E = Error
Message class: /PM0/ABZ_CMESSAGES -
Message number: 002
Message text: No definition of date determination possible at coverage level
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /PM0/ABZ_CMESSAGES002 No definition of date determination possible at coverage level typically occurs in the context of SAP's Project Management or Plant Maintenance modules, particularly when dealing with coverage levels for maintenance plans or project scheduling. This error indicates that the system cannot find a valid definition for determining dates at the specified coverage level. Causes: Missing Configuration: The date determination settings for the coverage level may not be configured correctly in the system. Incorrect Coverage Level: The coverage level being referenced may not exist or may not be properly defined in the system. Data Inconsistencies: There may be inconsistencies or missing data in the master data related to the maintenance plans or projects. Authorization Issues: The user may not have the necessary authorizations to access the required configuration or data. Solutions: Check Configuration: Navigate to the configuration settings for date determination in the relevant module (e.g., Plant Maintenance or Project Management). Ensure that the coverage
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ABZ_CMESSAGES001
Internal error: Field name invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABY_ULOG_MSGS008
Update run: Policy &1 was released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABZ_CMESSAGES003
Start date selection and selection of concrete start date inconsistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABZ_CMESSAGES004
No periodicity maintained for date scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.