Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABY_PP -
Message number: 090
Message text: Number of contracts in policy &1 exceeds package size &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABY_PP090
- Number of contracts in policy &1 exceeds package size &2 ?The SAP error message
/PM0/ABY_PP090
indicates that the number of contracts in a policy exceeds the allowed package size. This typically occurs in the context of SAP's contract management or insurance modules, where there are limits on how many contracts can be processed in a single transaction or package.Cause:
- Exceeding Package Size: The primary cause of this error is that the number of contracts associated with a specific policy exceeds the predefined limit set in the system configuration.
- Configuration Settings: The package size limit may be configured in the system settings, and it may not be suitable for the volume of contracts being processed.
- Data Entry Error: There may be an unintentional error in data entry that leads to an excessive number of contracts being associated with a single policy.
Solution:
- Check Configuration Settings: Review the configuration settings for the package size limit in the relevant SAP module. This may involve checking the settings in the customizing transaction (SPRO) or consulting with your SAP Basis or functional team.
- Split Contracts: If the number of contracts legitimately exceeds the limit, consider splitting the contracts into multiple transactions or packages to stay within the allowed size.
- Adjust Package Size: If appropriate, adjust the package size limit in the system configuration to accommodate the number of contracts you need to process. This should be done with caution and in consultation with your SAP administrator or functional consultant.
- Review Data Entry: Ensure that the data entry process is correct and that there are no errors leading to an excessive number of contracts being linked to a single policy.
Related Information:
By addressing the cause of the error and implementing the suggested solutions, you should be able to resolve the issue and continue processing contracts effectively.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABY_PP089
Use FPP => /PM0/ABY_FPP_FP_PA
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABY_PP088
BO &1 must not be changed; access mode is not persistent
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/PM0/ABY_PP091
System cannot load policy &1 status &2
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Policy &V3&, versio...
/PM0/ABY_PP092
System unable to load policy &1 status &2 correctly
What causes this issue? More than one data record with the required key was found in the database.System Response The system removes this policy fro...
Click on this link to search all SAP messages.