Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix /PM0/ABTM_3008 - Test run for client &1 completed successfully - &2 data records migrated


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PM0/ABTM_3 -

  • Message number: 008

  • Message text: Test run for client &1 completed successfully - &2 data records migrated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABTM_3008 - Test run for client &1 completed successfully - &2 data records migrated ?

    The SAP error message /PM0/ABTM_3008 indicates that a test run for a data migration process has completed successfully, and it provides information about the number of data records that were migrated. This message is not an error in the traditional sense; rather, it is an informational message indicating the outcome of a test run.

    Cause:

    • The message is generated during a test run of a data migration process, typically when using tools like the SAP Data Migration Workbench or similar migration tools.
    • The message indicates that the migration process was executed without any critical errors, and it successfully processed a specified number of data records.

    Solution:

    Since this message indicates a successful test run, there is no action required to resolve an error. However, if you are looking to proceed with the migration, consider the following steps:

    1. Review the Results: Check the details of the migration report to ensure that all expected records were processed correctly and that there are no warnings or issues that need to be addressed.

    2. Perform Actual Migration: If the test run was successful and you are satisfied with the results, you can proceed to execute the actual migration process.

    3. Check for Warnings: Even though the test run was successful, review any warnings or notes that may have been generated during the process. These could indicate potential issues that might arise during the actual migration.

    4. Backup Data: Before performing the actual migration, ensure that you have a backup of the existing data in case you need to revert to the previous state.

    5. Validate Data: After the actual migration, validate the migrated data to ensure that it meets your requirements and that no data integrity issues have occurred.

    Related Information:

    • Migration Tools: Familiarize yourself with the specific SAP tools being used for migration, such as SAP S/4HANA Migration Cockpit, SAP Data Services, or LSMW (Legacy System Migration Workbench).
    • Documentation: Refer to the official SAP documentation for the specific migration tool you are using for detailed instructions and best practices.
    • Support: If you encounter issues during the actual migration or have specific questions about the process, consider reaching out to SAP support or consulting with an SAP expert.

    In summary, the message /PM0/ABTM_3008 is a positive indication of a successful test run, and you can proceed with the next steps in your data migration process.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author