How To Fix /PM0/ABT_CML026 - &1 &2 &3 &4


/PM0/ABT_CML026 - Overview

  • Message type: E = Error

  • Message class: /PM0/ABT_CML -

  • Message number: 026

  • Message text: &1 &2 &3 &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABT_CML026 - &1 &2 &3 &4 ?
    The SAP error message /PM0/ABT_CML026 typically relates to issues in the context of Project System (PS) or Controlling (CO) modules, particularly when dealing with actual costs, budget management, or project accounting. The message usually indicates that there is a problem with the assignment of costs or budget to a project or internal order.
    
    Cause: The error message /PM0/ABT_CML026 can be triggered by several factors, including but not limited to: Incorrect Assignment: Costs or budget amounts may not be correctly assigned to the project or internal order. Missing Master Data: Required master data (like cost centers, internal orders, or WBS elements) may be missing or incorrectly configured. Budget Availability: The budget for the project or internal order may have been exceeded or not properly set up. Posting Period Issues: The posting period may be closed, preventing further postings. Authorization Issues: The user may not have the necessary authorizations to perform the action.
    Solution: To resolve the error, you can take

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker