How To Fix /PM0/ABT_CML008 - Error in calculation of planned records


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PM0/ABT_CML -

  • Message number: 008

  • Message text: Error in calculation of planned records

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABT_CML008 - Error in calculation of planned records ?

    The SAP error message /PM0/ABT_CML008 indicates that there is an error in the calculation of planned records in the context of Project System (PS) or Controlling (CO) modules. This error typically arises during the planning or budgeting processes when the system encounters inconsistencies or issues with the data being processed.

    Causes:

    1. Data Inconsistencies: There may be inconsistencies in the data related to planned costs, such as missing or incorrect entries in the cost planning tables.
    2. Configuration Issues: Incorrect configuration settings in the controlling area or project settings can lead to calculation errors.
    3. Missing Master Data: Required master data (like cost centers, internal orders, or activity types) may be missing or incorrectly defined.
    4. Currency Issues: Problems with currency conversion or mismatches between different currencies can also lead to calculation errors.
    5. Locked Records: If the records being processed are locked by another user or process, it may cause calculation errors.

    Solutions:

    1. Check Data Consistency: Review the planned records and ensure that all necessary data is correctly entered and consistent. Look for any missing or incorrect entries.
    2. Review Configuration: Verify the configuration settings in the controlling area and project settings to ensure they are set up correctly.
    3. Validate Master Data: Ensure that all required master data is available and correctly defined. This includes checking cost centers, internal orders, and activity types.
    4. Currency Settings: Check the currency settings and ensure that all relevant currencies are correctly defined and that there are no mismatches.
    5. Unlock Records: If records are locked, coordinate with other users or processes to unlock them before attempting the calculation again.
    6. Use Transaction Codes: Utilize transaction codes like CJ20N (Project Builder) or KP06 (Cost Planning) to review and adjust the planning data.

    Related Information:

    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP frequently updates its knowledge base with solutions for specific error messages.
    • Transaction Logs: Review transaction logs for more detailed error messages or warnings that can provide additional context for the issue.
    • User Authorization: Ensure that the user has the necessary authorizations to perform the planning activities.
    • Testing in Development: If possible, replicate the issue in a development or test environment to analyze the problem without affecting production data.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant