Message type: E = Error
Message class: /PM0/ABS_MESSAGES -
Message number: 038
Message text: Paid-to date of contract &1 has changed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABS_MESSAGES038
- Paid-to date of contract &1 has changed ?The SAP error message /PM0/ABS_MESSAGES038 indicates that the "Paid-to date of contract &1 has changed." This message typically arises in the context of Asset Accounting (FI-AA) or Project Management (PM) when there is a discrepancy between the expected paid-to date of a contract and the actual date that has been set or modified in the system.
Cause: Contract Modification: The paid-to date of the contract has been changed after transactions have already been posted against it. This can happen if a user updates the contract details without considering the implications on existing postings. Data Consistency Issues: There may be inconsistencies in the data due to manual changes or incorrect data entry. Integration Issues: If the contract is linked to other modules (like Project Systems or Asset Accounting), changes in one module may not be reflected correctly in another.
Solution: Review Contract Changes: Check the contract details to understand what changes were made to the paid-to date.
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ABS_MESSAGES037
Policy loan exists for policy &1 with contract &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABS_MESSAGES036
Irrevocable right to receive benefits assigned for coverage in ctrc. &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABS_MESSAGES039
First execute a simulated settlement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABS_MESSAGES040
Parameters for the transfer object have changed
What causes this issue? Some parameters for the replacement business or product change have changed, such as the <LS>Paid To</> date.Syst...
Click on this link to search all SAP messages.