Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABR_PM_PLAUSIS -
Message number: 339
Message text: Building structure end date must be identical to completion date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABR_PM_PLAUSIS339
- Building structure end date must be identical to completion date ?The SAP error message
/PM0/ABR_PM_PLAUSIS339
indicates that there is a mismatch between the building structure end date and the completion date in a project or maintenance order. This error typically arises in the context of project management or plant maintenance modules where specific dates are critical for planning and execution.Cause:
- Date Mismatch: The building structure end date does not match the completion date of the project or maintenance order. This could happen if the dates were entered incorrectly or if there were changes made to one of the dates without updating the other.
- Configuration Issues: There may be configuration settings in the system that enforce this rule, and if the dates are not aligned as per the business logic, the error will be triggered.
- Data Entry Errors: Manual data entry errors can lead to discrepancies between the two dates.
Solution:
- Check Dates: Review the building structure end date and the completion date in the relevant project or maintenance order. Ensure that both dates are identical.
- Update Dates: If there is a discrepancy, update either the building structure end date or the completion date to ensure they match.
- Review Configuration: If the issue persists, check the configuration settings in the SAP system to understand if there are any specific rules or validations that need to be adjusted.
- Consult Documentation: Refer to SAP documentation or your organization's guidelines for handling project dates to ensure compliance with business processes.
- Testing: After making changes, test the process again to ensure that the error no longer occurs.
Related Information:
CJ20N
(Project Builder) or IW32
(Change Order) to access and modify the relevant project or maintenance order.By following these steps, you should be able to resolve the error and ensure that the building structure end date and completion date are aligned correctly.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABR_PM_PLAUSIS338
Maximum duration for building structure insurance is &1 month(s)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABR_PM_PLAUSIS337
A coverage can only be included once for the same object
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABR_PM_PLAUSIS340
Sum insured type must be the same for all coverages in a contract
What causes this issue? The sum insured types of the coverages of the contract differ from one another. This is not allowed.System Response The syst...
/PM0/ABR_PM_PLAUSIS341
Adjustment object ( &1 ) not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.