Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABR_PM_ERRORS -
Message number: 247
Message text: Fund assets (&1) insufficent for cost withdrawal (&2); prop. reduced
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABR_PM_ERRORS247
- Fund assets (&1) insufficent for cost withdrawal (&2); prop. reduced ?The SAP error message
/PM0/ABR_PM_ERRORS247
indicates that there are insufficient fund assets available for a cost withdrawal in the context of Asset Accounting or Project Management. This error typically arises when trying to withdraw costs from a fund that does not have enough available budget or assets to cover the requested withdrawal amount.Cause:
- Insufficient Budget: The fund associated with the asset does not have enough budget allocated to cover the cost withdrawal.
- Incorrect Configuration: There may be issues with the configuration of the fund or the asset, such as incorrect settings in the fund management module.
- Timing Issues: The withdrawal may be attempted at a time when the budget is not yet available or has already been exhausted.
- Data Entry Errors: There may be errors in the data entry related to the asset or the cost withdrawal request.
Solution:
- Check Fund Availability: Verify the budget availability for the fund associated with the asset. Ensure that there are sufficient funds to cover the cost withdrawal.
- Adjust Budget: If the budget is insufficient, consider adjusting the budget for the fund to allow for the necessary withdrawals.
- Review Configuration: Check the configuration settings for the fund and asset to ensure they are set up correctly. This includes reviewing fund types, budget types, and any related settings in the SAP system.
- Timing Review: Ensure that the timing of the cost withdrawal aligns with the availability of the budget. If necessary, delay the withdrawal until funds are available.
- Data Validation: Review the data entered for the cost withdrawal to ensure there are no errors or discrepancies.
Related Information:
FMAVCR01
(to check budget availability) or S_ALR_87013558
(to view fund balances) to investigate the issue further.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in Fund Management or Asset Accounting.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABR_PM_ERRORS246
Perform.scenarios for main ins. and interest scen. for supp.ins.incompat.
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
/PM0/ABR_PM_ERRORS245
Fund credit &1 in calc.module &2 not sufficient for withdrawal of &3
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
/PM0/ABR_PM_ERRORS248
Addtl pymt or exchange for calc.bsd on sum ins.and one-tme prem.not poss.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABR_PM_ERRORS249
Premium for 'Savings' coverage must be greater than &1
What causes this issue? The premium amount is not sufficient for the <ZK>Savings</> coverage.System Response The system issues an error ...
Click on this link to search all SAP messages.