How To Fix /PM0/ABR_PM_ERRORS228 - Charge &2 is greater than the fund assets &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PM0/ABR_PM_ERRORS -

  • Message number: 228

  • Message text: Charge &2 is greater than the fund assets &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABR_PM_ERRORS228 - Charge &2 is greater than the fund assets &1 ?
    The SAP error message /PM0/ABR_PM_ERRORS228 indicates that there is an issue with a charge (or expense) that exceeds the available fund assets. This typically occurs in the context of Public Sector Management (PSM) or Fund Management (FM) modules in SAP, where budgetary controls are in place to ensure that expenditures do not exceed available funds.
    
    Cause: Exceeding Budget: The charge you are trying to process is greater than the available budget or fund assets. This can happen if: The budget has not been properly allocated or is insufficient. There are other outstanding commitments or expenses that have not been accounted for, which reduces the available balance. The charge amount was incorrectly entered or calculated. Incorrect Fund Assignment: The charge may be assigned to a fund that does not have sufficient assets. Timing Issues: If the budget is not yet available for the period in which the charge is being processed, this error can occur.
    Solution: Check Fund Availability: Review

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author