Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABR_PM_ERRORS -
Message number: 097
Message text: Fund assets (&1) are not sufficient for cost withdrawal (&2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABR_PM_ERRORS097
- Fund assets (&1) are not sufficient for cost withdrawal (&2) ?The SAP error message
/PM0/ABR_PM_ERRORS097
indicates that there are insufficient fund assets available for a cost withdrawal in the context of Project Management (PM) or Asset Accounting (AA). This error typically arises when trying to withdraw costs from a fund that does not have enough available budget or assets to cover the requested withdrawal.Cause:
- Insufficient Budget: The fund associated with the project or asset does not have enough budget allocated to cover the cost withdrawal.
- Incorrect Fund Assignment: The project or asset may be incorrectly assigned to a fund that does not have sufficient resources.
- Cost Overrun: The costs being withdrawn exceed the available budget or assets due to unexpected expenses or miscalculations.
- Fund Availability Check: The system performs a check on fund availability, and if the available balance is less than the withdrawal amount, this error is triggered.
Solution:
- Check Fund Availability: Review the fund's budget and ensure that there are sufficient assets available for the cost withdrawal. You can do this by navigating to the relevant fund management or budget management transactions in SAP.
- Adjust Budget: If the budget is insufficient, consider adjusting the budget for the fund to accommodate the cost withdrawal. This may involve reallocating funds or increasing the budget.
- Review Cost Allocation: Ensure that the costs being withdrawn are correctly allocated to the appropriate fund. If there are discrepancies, correct them in the system.
- Consult with Finance Team: If you are unsure about the budget or fund allocations, consult with your finance or accounting team to get clarity on the available funds and any necessary adjustments.
- Transaction Codes: Use relevant transaction codes such as
FMAVCR01
(for checking budget availability) orFMBB
(for budget adjustments) to manage and review fund allocations.Related Information:
FMBB
, FMAVCR01
, and FMBT
for budget transfers.By following these steps, you should be able to resolve the error and ensure that your cost withdrawals are processed successfully.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABR_PM_ERRORS096
Profit parameter (dividend rate) not unique
What causes this issue? The calculation cannot be carried out.System Response The system issues an error message and will not allow you to continue ...
/PM0/ABR_PM_ERRORS095
Dividend parameters not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABR_PM_ERRORS100
No formula available for age at entry calculation method
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
/PM0/ABR_PM_ERRORS101
Benefit value type (&1) is unknown
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
Click on this link to search all SAP messages.