Message type: E = Error
Message class: /PM0/ABR_PM_ERRORS -
Message number: 046
Message text: Unit costs - withdrawal type incorrect for &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABR_PM_ERRORS046
- Unit costs - withdrawal type incorrect for &1 ?The SAP error message /PM0/ABR_PM_ERRORS046 indicates that there is an issue with the unit costs related to a withdrawal type in the context of a project management or asset management scenario. This error typically arises when the system encounters an inconsistency or an invalid configuration regarding the withdrawal type for a specific cost element or project.
Cause: Incorrect Configuration: The withdrawal type may not be correctly configured in the system. This could be due to missing or incorrect settings in the relevant master data (e.g., material master, cost center, or project definition). Invalid Cost Element: The cost element associated with the withdrawal type may not be valid or may not have the necessary settings for the transaction being processed. Data Inconsistency: There may be inconsistencies in the data related to the project or asset, such as missing or incorrect entries in the relevant tables. Authorization Issues: Sometimes, the user may not have the necessary authorizations
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ABR_PM_ERRORS028
Final age is greater than table end, &1, age at entry &2
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
/PM0/ABR_PM_ERRORS025
Life ins. status incorrect: &1
What causes this issue? A calculation error occurred in the product engine msg.PMQ.System Response The calculation cannot be carried out.How to fix ...
/PM0/ABR_PM_ERRORS047
Unit costs distribution is incorrect for &1
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
/PM0/ABR_PM_ERRORS062
Incorrect cause of event for: &1 cause: &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.