How To Fix /PM0/ABP_TMF_MSG010 - &1: Scheduling of date &2 &3 not possible on &4


/PM0/ABP_TMF_MSG010 - Overview

  • Message type: E = Error

  • Message class: /PM0/ABP_TMF_MSG -

  • Message number: 010

  • Message text: &1: Scheduling of date &2 &3 not possible on &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABP_TMF_MSG010 - &1: Scheduling of date &2 &3 not possible on &4 ?
    The SAP error message /PM0/ABP_TMF_MSG010 &1: Scheduling of date &2 &3 not possible on &4 typically indicates that there is an issue with scheduling a task or operation in the SAP system. This error can arise in various contexts, such as project management, maintenance planning, or production scheduling.
    
    Cause: Date Conflicts: The specified date for scheduling may conflict with existing tasks, maintenance windows, or resource availability. Resource Unavailability: The resources (e.g., personnel, equipment) required for the task may not be available on the specified date. Incorrect Configuration: There may be configuration issues in the scheduling parameters or settings in the SAP system. Calendar Settings: The work calendar for the resource or the project may not allow scheduling on the specified date. Status of the Task: The task or operation may be in a status that does not allow scheduling (e.g., completed, canceled).
    Solution: Check Dates: Verify the specified date and ensure it does not conflict with other scheduled

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author