Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_TM_MSG -
Message number: 087
Message text: &1 not updated; no subsequent date available
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_TM_MSG087
- &1 not updated; no subsequent date available ?The SAP error message
/PM0/ABP_TM_MSG087 &1 not updated; no subsequent date available
typically occurs in the context of the SAP Plant Maintenance (PM) module, particularly when dealing with maintenance tasks or notifications. This error indicates that a specific object (like a maintenance order or notification) could not be updated because there is no subsequent date available for the operation or task being processed.Cause:
Missing Subsequent Date: The primary cause of this error is that the system cannot find a subsequent date for the operation or task. This could be due to:
- The task or operation has not been scheduled properly.
- The dates for the maintenance plan or task are not defined correctly.
- The maintenance order or notification is in a status that does not allow updates.
Configuration Issues: There may be configuration issues in the maintenance planning settings that prevent the system from determining the next available date.
Data Integrity Issues: There could be inconsistencies or missing data in the master data related to the maintenance task, such as equipment or functional location data.
Solution:
Check Maintenance Plan: Review the maintenance plan associated with the task or notification. Ensure that the subsequent dates are defined correctly and that the plan is active.
Update Task Dates: If the task or operation is not scheduled, you may need to manually update the dates or reschedule the task to ensure that there is a subsequent date available.
Review Status: Check the status of the maintenance order or notification. If it is in a status that does not allow updates (e.g., completed or closed), you may need to change the status or create a new order/notification.
Configuration Review: If the issue persists, review the configuration settings in the SAP PM module to ensure that all necessary parameters for scheduling and maintenance planning are correctly set.
Data Consistency Check: Perform a data consistency check to ensure that all related master data (equipment, functional locations, etc.) is complete and accurate.
Consult Documentation: Refer to SAP documentation or support notes related to this specific error message for additional troubleshooting steps or patches.
Related Information:
If the problem continues after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_TM_MSG086
&1 not updated; target date &4 reached; next date &2
What causes this issue? The update of &V1& was completed, however no dates were agreed in the update. The next date is the effective date &am...
/PM0/ABP_TM_MSG085
&1 updated to &3; no subsequent date available
What causes this issue? The update of &V1& was completed. The last agreed date was the date scheduled for the effective date &V3&. Th...
/PM0/ABP_TM_MSG088
&1 updated to &3; target date &4 not reached; next date &2
What causes this issue? The update of &V1& was completed. The last agreed date was the date scheduled for the effective date &V3&. Th...
/PM0/ABP_TM_MSG089
&1 not updated; target date &4 not reached; next date &2
What causes this issue? The update of &V1& was completed. No dates were agreed in the update. The next date is for the effective date &V2...
Click on this link to search all SAP messages.