Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_REPVAL_MSG -
Message number: 001
Message text: No preliminary reported value can be determined for settlement period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_REPVAL_MSG001
- No preliminary reported value can be determined for settlement period ?The SAP error message
/PM0/ABP_REPVAL_MSG001
indicates that the system is unable to determine a preliminary reported value for a specified settlement period. This error typically arises in the context of SAP's Project Management or Asset Accounting modules, where reported values are essential for financial reporting and analysis.Causes:
- Missing Data: The most common cause is that there is no data available for the specified settlement period. This could be due to missing postings or transactions that should have been recorded.
- Incorrect Configuration: The configuration settings for the reporting or settlement process may not be set up correctly, leading to the inability to retrieve the necessary values.
- Period Closure: The settlement period may be closed, preventing any further postings or adjustments from being made.
- Authorization Issues: The user may not have the necessary authorizations to view or access the reported values for the specified period.
- Data Consistency Issues: There may be inconsistencies in the data that prevent the system from calculating the reported values correctly.
Solutions:
- Check Data Availability: Verify that all necessary transactions and postings for the settlement period have been completed. Ensure that there are no missing entries.
- Review Configuration: Check the configuration settings related to the reporting and settlement processes. Ensure that all necessary parameters are correctly set.
- Open the Period: If the settlement period is closed, consider reopening it if appropriate, or check if there are any pending transactions that need to be processed.
- Authorization Check: Ensure that the user has the necessary permissions to access the data for the settlement period. This may involve checking user roles and authorizations in the SAP system.
- Data Consistency Check: Run consistency checks or reports to identify any data issues that may be affecting the reported values. This may involve using transaction codes like
SE38
to run specific reports or checks.- Consult Documentation: Refer to SAP documentation or support notes related to this error message for additional troubleshooting steps or patches that may address the issue.
Related Information:
CJ20N
(Project Builder), CJI3
(Project Actual Line Items), or S_ALR_87013558
(Project Reports) to analyze project data.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_REPVAL_MSG000
System unable to call the BAdI for settlement of the reported value
What causes this issue? The system was unable to call the BAdI for settlement of the reported value (/PM0/ABT_SETTLE_REPVAL_BADI).System Response Th...
/PM0/ABP_RENEWAL_MSG015
Effective date of business transaction must be same as contract end &1
What causes this issue? The effective date of renewal is after the current contract end date. Consequently the contract must be <ZK>suspended&l...
/PM0/ABP_REPVAL_MSG002
Could not determine a final reported value for the settlement period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_REPVAL_MSG003
No preliminary reported value can be determined for settlement period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.