Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_PP -
Message number: 029
Message text: Run finished
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_PP029
- Run finished ?The SAP error message
/PM0/ABP_PP029 Run finished
typically indicates that a particular process or job in the SAP system has completed its execution. This message is often associated with background jobs or processes related to production planning (PP) or other modules within SAP.Cause:
- Job Completion: The message signifies that a scheduled job or process has finished running. This could be a batch job, a report execution, or a data processing task.
- No Errors: The message itself does not indicate an error; rather, it is a notification that the job has completed, which may be successful or unsuccessful depending on the context.
- Job Status: If the job was expected to perform certain actions (like data updates, report generation, etc.), the message may indicate that the job has finished without any further details on the outcome.
Solution:
- Check Job Logs: To understand the outcome of the job, check the job logs or output. This can be done through transaction codes like
SM37
(for monitoring jobs) orSLG1
(for application logs).- Review Job Parameters: Ensure that the job was configured correctly with the right parameters and settings. If it was supposed to perform specific actions, verify that those actions were executed as intended.
- Error Handling: If the job did not complete successfully, look for any error messages or warnings in the logs that could provide insight into what went wrong.
- Re-run the Job: If necessary, you may need to re-run the job with corrected parameters or after addressing any issues identified in the logs.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the job or process that generated this message.
Related Information:
SM37
for job monitoring, SM21
for system logs, and SLG1
for application logs.In summary, the message /PM0/ABP_PP029 Run finished
is a notification of job completion, and further investigation into job logs and parameters is necessary to determine the success or failure of the job.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_PP028
Run with no. '&1' and ID '&2' started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_PP027
Package creation completed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_PP030
Run is in refusal mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_PP031
Run is in inquiry mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.