Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_PLAN_EXTDT -
Message number: 020
Message text: You must enter an effective date and a date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_PLAN_EXTDT020
- You must enter an effective date and a date ?The SAP error message
/PM0/ABP_PLAN_EXTDT020
indicates that an effective date and a date must be entered in the context of planning or scheduling within the SAP system. This error typically arises in modules related to project management, maintenance planning, or similar areas where date management is crucial.Cause:
- Missing Date Fields: The error usually occurs when the user attempts to save or process a transaction without filling in the required date fields. This could be the effective date for a plan or a specific date related to a task or project.
- Incorrect Date Format: Sometimes, the date may be entered in an incorrect format, which the system does not recognize.
- Configuration Issues: There may be configuration settings in the SAP system that require certain date fields to be mandatory, and if they are not filled, the error will be triggered.
Solution:
- Enter Required Dates: Ensure that you fill in all mandatory date fields, including the effective date and any other relevant dates required by the transaction you are processing.
- Check Date Format: Verify that the dates are entered in the correct format as per your system's configuration (e.g., DD/MM/YYYY or MM/DD/YYYY).
- Review Configuration: If you have the necessary permissions, check the configuration settings in the relevant module to ensure that the date fields are set up correctly. If you are not authorized, contact your SAP administrator or support team for assistance.
- Consult Documentation: Refer to the SAP documentation or help files related to the specific transaction or module you are working with for additional guidance on required fields.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to escalate the issue to your SAP support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_PLAN_EXTDT019
Time model function &2 is not valid for contract &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_PLAN_EXTDT018
Contract &1 is not valid on the scheduled date
What causes this issue? You are attempting to schedule an effective date that is outside the contract term (before or after the contract start or end...
/PM0/ABP_PLAN_EXTDT021
Entry not unique
What causes this issue? Either the values that you entered in the fields are mutually exclusive or they are incomplete.System Response Date scheduli...
/PM0/ABP_PLAN_EXTDT022
Date &1 for contract &2 of policy &3 successfully scheduled for &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.