Message type: E = Error
Message class: /PM0/ABP_MESSAGES -
Message number: 021
Message text: Process Controller not initialized correctly in framework reg.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_MESSAGES021
- Process Controller not initialized correctly in framework reg. ?The SAP error message /PM0/ABP_MESSAGES021 Process Controller not initialized correctly in framework reg. typically indicates an issue with the initialization of the Process Controller in the SAP system. This error can arise due to various reasons, including configuration issues, missing components, or problems with the framework registration. Causes: Incorrect Configuration: The Process Controller may not be configured correctly in the system. Missing Dependencies: Required components or dependencies for the Process Controller may be missing or not properly installed. Framework Registration Issues: The Process Controller may not be registered correctly in the framework, leading to initialization failures. Version Mismatch: There may be a version mismatch between the Process Controller and other components of the SAP system. Authorization Issues: Insufficient authorizations for the user trying to access the Process Controller. Solutions: Check Configuration: Review the configuration settings for the Process Controller in the SAP system. Ensure that all necessary parameters are set correctly. Verify Installation: Ensure that all required components for
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ABP_MESSAGES020
Uncorrectible error while determining proccess-dep. field modif. variant
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_MESSAGES019
Enter numeric values only for the policy number
What causes this issue? You have entered invalid characters for the policy number. The policy number can only contain digits.System Response The sys...
/PM0/ABP_MESSAGES022
Current process controller is not a BPM controller
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_MESSAGES023
Error when initializing correspondence controller
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.