Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_DATECALC -
Message number: 010
Message text: Day &1 is incorrect for calculation &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_DATECALC010
- Day &1 is incorrect for calculation &2 ?The SAP error message
/PM0/ABP_DATECALC010 Day &1 is incorrect for calculation &2
typically indicates that there is an issue with the date being processed in a calculation. This error can arise in various contexts, such as when working with date calculations in project management, maintenance planning, or other modules that involve date handling.Cause:
- Invalid Date Input: The day specified in the calculation is not valid. For example, if the day is set to 32 for a month that only has 31 days.
- Incorrect Date Format: The date might not be in the expected format, leading to misinterpretation by the system.
- Calendar Settings: The system's calendar settings may not align with the date being processed, such as fiscal year settings or holiday calendars.
- Data Entry Errors: Manual data entry errors can lead to incorrect dates being inputted into the system.
Solution:
- Check the Date: Verify the day and month being used in the calculation. Ensure that the day is valid for the specified month and year.
- Correct Format: Ensure that the date is entered in the correct format as expected by the SAP system.
- Review Calendar Settings: Check the calendar settings in the system to ensure they are configured correctly. This includes fiscal year settings and any custom calendars that may be in use.
- Data Validation: Implement validation checks in the data entry process to prevent invalid dates from being entered.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the calculation type mentioned in the error message.
Related Information:
If the problem persists after checking the above points, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and data involved in your scenario.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_DATECALC008
No standard premium exists, and consequently there is no main due date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_DATECALC007
System does not recognize factory calendar &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_DATECALC011
Period 0 for calculation of next periodic date
What causes this issue? The value <ZH>Null</> was read from the static product information as the period for the periodicity of the risk ...
/PM0/ABP_DATECALC012
&1 is an invalid date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.