How To Fix /PM0/ABP_DATECALC002 - Date &2 is outside of calendar for calculation &1


/PM0/ABP_DATECALC002 - Overview

  • Message type: E = Error

  • Message class: /PM0/ABP_DATECALC -

  • Message number: 002

  • Message text: Date &2 is outside of calendar for calculation &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABP_DATECALC002 - Date &2 is outside of calendar for calculation &1 ?
    The SAP error message /PM0/ABP_DATECALC002 Date &2 is outside of calendar for calculation &1 typically indicates that a date being processed is not valid within the defined calendar for a specific calculation. This error often arises in the context of date calculations, such as those used in project management, maintenance planning, or other time-sensitive operations.
    
    Cause: Invalid Date: The date specified (represented by &2) is outside the range of dates defined in the calendar associated with the calculation (represented by &1). Calendar Configuration: The calendar used for the calculation may not include the date in question, possibly due to holidays, weekends, or other non-working days. Incorrect Assignment: The calculation may be incorrectly assigned to a calendar that does not cover the required date range.
    Solution: Check the Date: Verify the date (&2) that is causing the error. Ensure that it is a valid date and falls within the expected range. Review Calendar Settings: Go to the calendar configuration

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker