Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_CHECKDERIVE -
Message number: 005
Message text: More than one risk structure node was found
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_CHECKDERIVE005
- More than one risk structure node was found ?The SAP error message
/PM0/ABP_CHECKDERIVE005
indicates that there is an issue with the risk structure in the context of the SAP Risk Management module. Specifically, the error message states that more than one risk structure node was found when the system expected only one. This can occur during processes that involve risk assessment or risk analysis where the system is trying to derive or evaluate a specific risk structure.Cause:
- Duplicate Nodes: The most common cause of this error is the presence of duplicate nodes in the risk structure. This can happen if the risk structure has been incorrectly configured or if there are multiple entries that meet the criteria for the operation being performed.
- Configuration Issues: There may be issues in the configuration of the risk management settings, leading to ambiguity in the risk structure.
- Data Integrity Issues: There could be inconsistencies or errors in the underlying data that define the risk structure.
Solution:
Check Risk Structure Configuration:
- Navigate to the risk structure configuration in SAP and review the nodes defined. Ensure that there are no duplicate entries for the same criteria.
- If duplicates are found, remove or consolidate them to ensure that each node is unique.
Data Validation:
- Validate the data associated with the risk structure. Check for any inconsistencies or errors that might lead to multiple nodes being returned.
- Use transaction codes like
SPRO
to access the configuration settings and verify the integrity of the data.Review Selection Criteria:
- If the error occurs during a specific transaction or report, review the selection criteria being used. Ensure that the criteria are specific enough to return a single node.
Consult Documentation:
- Refer to SAP documentation or notes related to the specific version of SAP you are using. There may be known issues or patches available that address this error.
Contact SAP Support:
- If the issue persists after checking the configuration and data, consider reaching out to SAP support for further assistance. Provide them with details of the error message and the context in which it occurs.
Related Information:
SPRO
for configuration, SE11
for data dictionary, and SE80
for object navigator./PM0/ABP_CHECKDERIVE005
in the SAP Support Portal for any specific fixes or recommendations.By following these steps, you should be able to identify and resolve the issue causing the error message.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_CHECKDERIVE004
Dependency relationship for dependency &1 was changed
What causes this issue? The referenced objects in the dependency plan are no longer valid due to a change, such as the deletion of a contract. The re...
/PM0/ABP_CHECKDERIVE003
Dependency number &1 was deleted
What causes this issue? Referenced objects in the dependency plan are no longer valid because data has been changed (for example, a contract was dele...
/PM0/ABP_CHECKDERIVE008
No end date entered for suspension; end date set to High Date
What causes this issue? You have not entered a date for <LS>Suspension End</>.System Response The system therefore automatically sets th...
/PM0/ABP_CHECKDERIVE010
Final age of insured person is too low
What causes this issue? The final age that you entered for the insured person is too low.System Response The contract end calculated from the final ...
Click on this link to search all SAP messages.