How To Fix /PM0/ABP_BIZPRC438 - No BTS date was scheduled for entry &1 &2 &3 &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PM0/ABP_BIZPRC -

  • Message number: 438

  • Message text: No BTS date was scheduled for entry &1 &2 &3 &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABP_BIZPRC438 - No BTS date was scheduled for entry &1 &2 &3 &4 ?

    The SAP error message /PM0/ABP_BIZPRC438 No BTS date was scheduled for entry &1 &2 &3 &4 typically occurs in the context of business process management or project management within SAP. This error indicates that there is no "BTS" (Business Transaction Scheduling) date scheduled for the specified entry, which is identified by the placeholders &1, &2, &3, and &4. These placeholders usually represent specific identifiers related to the transaction or process that is being executed.

    Cause:

    1. Missing Scheduling Information: The most common cause of this error is that the system does not have a scheduled date for the business transaction you are trying to process. This could be due to:

      • The transaction not being properly set up in the system.
      • Missing configuration or data entries in the relevant tables.
      • The transaction might not have been activated or scheduled correctly.
    2. Incorrect Data Entry: If the data being entered does not match the expected format or if required fields are left blank, it can lead to this error.

    3. System Configuration Issues: There may be issues with the configuration of the business process or project management settings in SAP.

    Solution:

    1. Check Scheduling Configuration:

      • Verify that the business transaction you are trying to process has been properly scheduled. This may involve checking the relevant transaction codes and ensuring that all necessary dates and times are set up in the system.
    2. Review Data Entries:

      • Ensure that all required fields are filled out correctly. Check for any missing or incorrect entries that could be causing the error.
    3. Consult Documentation:

      • Refer to the SAP documentation or help files related to the specific module you are working with. This can provide insights into the required configurations and settings.
    4. Transaction Activation:

      • If the transaction has not been activated, you may need to activate it in the system. This could involve working with your SAP administrator or functional consultant.
    5. Debugging:

      • If you have access to debugging tools, you can trace the execution of the transaction to identify where the scheduling information is missing.
    6. Contact Support:

      • If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance based on your specific system configuration and business processes.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this specific error message. SAP Notes often contain patches, updates, or workarounds for known issues.
    • Transaction Codes: Familiarize yourself with transaction codes related to business process scheduling, such as SWI1 (Work Item Selection) or SWI2_FREQ (Work Item Selection by Frequency).
    • User Roles and Authorizations: Ensure that the user executing the transaction has the necessary authorizations to schedule business transactions.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant