Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_BIZPRC -
Message number: 322
Message text: Policy processing required; individual contract positioning not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_BIZPRC322
- Policy processing required; individual contract positioning not possible ?The SAP error message
/PM0/ABP_BIZPRC322 Policy processing required; individual contract positioning not possible
typically occurs in the context of contract management or policy processing within SAP systems, particularly in modules related to project management or business process management.Cause:
This error message indicates that the system requires a policy processing step to be completed before it can proceed with individual contract positioning. The underlying causes may include:
- Missing Policy Configuration: The necessary policies for contract processing have not been defined or activated in the system.
- Incomplete Data: Required data for the policy processing is missing or incomplete, preventing the system from executing the necessary steps.
- Incorrect Contract Status: The contract may not be in the correct status to allow for individual positioning.
- Authorization Issues: The user may not have the necessary authorizations to perform the required actions related to policy processing.
Solution:
To resolve this error, you can take the following steps:
Check Policy Configuration:
- Ensure that the relevant policies for contract processing are correctly configured in the system. This may involve reviewing the settings in the relevant customizing transactions (e.g., SPRO).
Complete Required Data:
- Verify that all necessary data for the contract and policy processing is complete. This may include checking for missing fields or incomplete entries in the contract.
Review Contract Status:
- Check the status of the contract to ensure it is in a state that allows for individual positioning. If the contract is in a locked or inactive state, you may need to change its status.
User Authorizations:
- Ensure that the user attempting to perform the action has the necessary authorizations. This may involve checking user roles and permissions in the SAP system.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on policy processing and contract management in your version of SAP.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with SAP support for further assistance.
Related Information:
ME31K
(Create Contract), ME32K
(Change Contract), or ME33K
(Display Contract).By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_BIZPRC321
Policy &1 contract &2: Reversal notification date is &3
What causes this issue? A reversal notification date is performed earlier.System Response The policy or the contracts will not be reversed.How to fi...
/PM0/ABP_BIZPRC320
Template &2 is not permitted for master policy number &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_BIZPRC323
Policy &1 contract &2: reversal date &3 must be after &4
What causes this issue? Reversal date &V3& must be later than the current status &V4& of contract &V2&.System Response Proce...
/PM0/ABP_BIZPRC324
Policy &1 contract &2; a reversal date &3 already exists
What causes this issue? A BTS date exists for the contract to be reversed.System Response A message was raised.How to fix this error? If you perfor...
Click on this link to search all SAP messages.