Message type: E = Error
Message class: /PM0/ABP_BIZPRC -
Message number: 177
Message text: At least 3 contracts, or all contracts, do not have to be reversed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_BIZPRC177
- At least 3 contracts, or all contracts, do not have to be reversed ?The SAP error message
/PM0/ABP_BIZPRC177
indicates that there is an issue with the reversal of contracts in the system. Specifically, the message states that at least three contracts, or all contracts, do not need to be reversed. This typically occurs in the context of contract management or project management within SAP.Cause:
- Contract Status: The contracts you are trying to reverse may not be in a status that allows for reversal. For example, they might be completed, closed, or otherwise finalized.
- Business Logic: The business rules defined in your SAP system may require a minimum number of contracts to be eligible for reversal. If fewer than three contracts meet the criteria, the system will prevent the reversal.
- Configuration Settings: There may be specific configuration settings in your SAP system that dictate how contract reversals are handled, including thresholds for the number of contracts that can be reversed at once.
Solution:
- Check Contract Status: Review the status of the contracts you are attempting to reverse. Ensure that they are in a state that allows for reversal.
- Review Business Rules: Consult with your business process owner or SAP functional consultant to understand the business rules governing contract reversals. Ensure that you are meeting the minimum requirements for the number of contracts.
- Adjust Configuration: If necessary, work with your SAP Basis or configuration team to adjust the settings related to contract reversals. This may involve changing the minimum number of contracts required for a reversal.
- Reversal Process: If you are trying to reverse multiple contracts, consider reversing them in smaller batches, ensuring that each batch meets the criteria set by the system.
Related Information:
CJ20N
for project management or ME32K
for contract management.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or raise a ticket with SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ABP_BIZPRC176
Dates scheduled successfully for unscheduled correspondence
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_BIZPRC175
No default product module group for dimension &1, product class &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_BIZPRC178
Adjustment of &1 for coverage &2 opposed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_BIZPRC179
No scheduled processing was performed for contract &2 up to date &1
What causes this issue? Planned processing could not be carried out. Updating was cancelled.System Response The system issues an error message and w...