How To Fix /PM0/ABP_BCA_MSG506 - The start date of at least one coverage must match contract start date


/PM0/ABP_BCA_MSG506 - Overview

  • Message type: E = Error

  • Message class: /PM0/ABP_BCA_MSG -

  • Message number: 506

  • Message text: The start date of at least one coverage must match contract start date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABP_BCA_MSG506 - The start date of at least one coverage must match contract start date ?
    The SAP error message /PM0/ABP_BCA_MSG506 indicates that there is a mismatch between the start date of a coverage and the start date of the associated contract. This error typically occurs in the context of contract management or coverage management within SAP, particularly in modules related to project management or asset management.
    
    Cause: Date Mismatch: The start date of at least one coverage (e.g., insurance coverage, service coverage) does not align with the start date of the contract. This could happen if the coverage was created with a different start date than the contract. Incorrect Data Entry: During the creation or modification of the coverage, the user may have entered an incorrect start date. System Configuration: There may be configuration settings in the SAP system that enforce this rule, requiring that coverage dates must align with contract dates.
    Solution: Check Coverage Dates: Review the coverage details associated with the contract. Ensure that the start date of the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant