Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_ACC -
Message number: 021
Message text: Manual posting outside of contract term (&1 - &2) is not permitted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_ACC021
- Manual posting outside of contract term (&1 - &2) is not permitted ?The SAP error message
/PM0/ABP_ACC021 Manual posting outside of contract term (&1 - &2) is not permitted
typically occurs in the context of contract management or project management within SAP. This error indicates that a manual posting is being attempted outside the defined contract term, which is not allowed by the system's configuration.Cause:
- Contract Term Violation: The posting date of the transaction falls outside the start and end dates of the associated contract.
- Configuration Settings: The system is configured to restrict postings to only those that fall within the valid contract period.
- Incorrect Posting Date: The user may have entered an incorrect posting date that does not align with the contract's validity period.
Solution:
- Check Contract Dates: Verify the start and end dates of the contract associated with the posting. Ensure that the posting date falls within this range.
- Adjust Posting Date: If the posting date is incorrect, adjust it to a date that is within the contract term.
- Contract Extension: If the contract needs to be extended, consider updating the contract's end date to accommodate the required postings.
- Review Configuration: If you believe the posting should be allowed, review the configuration settings in the SAP system to see if adjustments can be made to allow for more flexibility in posting dates.
- Consult Documentation: Refer to SAP documentation or consult with your SAP administrator for specific guidelines on handling contract-related postings.
Related Information:
ME23N
(Display Purchase Order) or CJ20N
(Project Builder) to review contract details.By following these steps, you should be able to resolve the error and successfully complete the posting within the allowed contract terms.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_ACC020
Assign coverage for posting code &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_ACC011
Error accessing Customizing table &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_ACC022
G/L posting for multi-currency contract &1 / &2 is not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_ACC040
Clearing data could not be determined in postdated form
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.