How To Fix /PM0/ABO_BO_MESSAGE005 - Specify when the building is ready for occupation


/PM0/ABO_BO_MESSAGE005 - Overview

  • Message type: E = Error

  • Message class: /PM0/ABO_BO_MESSAGE -

  • Message number: 005

  • Message text: Specify when the building is ready for occupation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABO_BO_MESSAGE005 - Specify when the building is ready for occupation ?
    The SAP error message /PM0/ABO_BO_MESSAGE005 typically indicates that a building or construction project has not been marked as ready for occupation in the system. This message is often encountered in the context of project management or asset management within SAP, particularly in modules related to real estate or construction.
    
    Cause: The error occurs when: The system requires a status update indicating that the building is ready for occupation before proceeding with further actions (e.g., finalizing the project, moving to the next phase, or processing related transactions). The necessary data or status has not been entered or updated in the system.
    Solution: To resolve this error, you should: Check the Building Status: Navigate to the relevant transaction or module where the building or project is managed. Verify if the building has been marked as "ready for occupation." Update the Status: If the building is indeed ready, update the status in the system. This may involve: Accessing the project or asset

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author