Message type: E = Error
Message class: /PM0/ABB_MESSAGES -
Message number: 135
Message text: You cannot change the duration and end date at the same time
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABB_MESSAGES135
- You cannot change the duration and end date at the same time ?The SAP error message
/PM0/ABB_MESSAGES135
indicates that you are trying to change both the duration and the end date of a project or task simultaneously, which is not allowed in the system. This restriction is in place to maintain data integrity and avoid conflicts in scheduling.Cause:
- Simultaneous Changes: The error occurs when a user attempts to modify both the duration and the end date of a project or task at the same time. The system requires that only one of these parameters be changed to ensure that the scheduling logic remains consistent.
- System Configuration: The configuration settings in the project management module may enforce this rule to prevent potential conflicts in project timelines.
Solution:
To resolve this error, you should follow these steps:
Decide on the Change: Determine whether you want to change the duration or the end date, but not both at the same time.
Change One Parameter:
- If you want to change the duration, adjust the duration field and leave the end date unchanged.
- If you want to change the end date, adjust the end date field and leave the duration unchanged.
Save Changes: After making the desired change, save the record. If you need to make the other change later, you can do so after saving the first change.
Check Dependencies: Ensure that any changes you make do not violate dependencies or constraints set within the project.
Related Information:
If you continue to experience issues or if the error persists despite following the above steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project management within SAP.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABB_MESSAGES134
No adjustment level exists for PMID (&1), PLID(&2), and generation (&3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABB_MESSAGES133
No generation exists for sales event (&1), PMID (&2), and PLID (&3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABB_MESSAGES136
Input limit &1 exceeded by &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABB_MESSAGES137
No partner assigned to the insured person
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.