How To Fix /PM0/ABB_INTERFACE001 - No valid line of business was transferred


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PM0/ABB_INTERFACE -

  • Message number: 001

  • Message text: No valid line of business was transferred

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABB_INTERFACE001 - No valid line of business was transferred ?

    The SAP error message /PM0/ABB_INTERFACE001 No valid line of business was transferred typically occurs in the context of the ABB (Asset-Based Billing) interface when there is an issue with the data being transferred, specifically related to the line of business (LoB) information. This error indicates that the system could not find a valid line of business associated with the transaction or data being processed.

    Causes:

    1. Missing Configuration: The line of business may not be properly configured in the system. This could be due to missing entries in the relevant configuration tables.
    2. Incorrect Data: The data being transferred may contain incorrect or invalid values for the line of business.
    3. Mapping Issues: There may be issues with the mapping of the line of business in the interface settings.
    4. Authorization Issues: The user or process may not have the necessary authorizations to access the line of business data.
    5. Data Transfer Errors: There could be issues in the data transfer process, such as network problems or incorrect data formats.

    Solutions:

    1. Check Configuration: Verify that the line of business is correctly configured in the system. This includes checking the relevant customizing settings in SPRO.
    2. Validate Data: Review the data being transferred to ensure that it contains valid line of business values. This may involve checking the source system or the data extraction process.
    3. Review Mapping: If applicable, check the mapping settings in the interface to ensure that the line of business is correctly mapped to the corresponding values in the target system.
    4. Authorization Check: Ensure that the user or process executing the transaction has the necessary authorizations to access the line of business data.
    5. Error Logs: Check the application logs (transaction SLG1) for more detailed error messages that may provide additional context for the issue.
    6. Consult Documentation: Refer to SAP documentation or notes related to the ABB interface for any specific requirements or known issues.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like SPRO (for configuration), SLG1 (for logs), or SE11 (for data dictionary) to investigate the issue further.
    • SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error or provide additional troubleshooting steps.
    • Support: If the issue persists after checking the above points, consider reaching out to SAP support for assistance, providing them with detailed information about the error and the context in which it occurs.

    By following these steps, you should be able to identify and resolve the issue related to the /PM0/ABB_INTERFACE001 error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author