Do you have any question about this error?
Message type: E = Error
Message class: /PM0/AB_IBC_CNFG_I_4 -
Message number: 102
Message text: Start date of generation &1 is earlier than &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/AB_IBC_CNFG_I_4102
- Start date of generation &1 is earlier than &2 ?The SAP error message
/PM0/AB_IBC_CNFG_I_4102
indicates that there is a problem with the start date of a generation process in the context of Integrated Business Planning (IBP) or similar applications. Specifically, the error states that the start date of the generation (&1
) is earlier than the allowed date (&2
). This typically occurs when the system is trying to schedule a process or task that has a start date that does not comply with the defined time constraints.Cause:
- Incorrect Date Configuration: The start date for the generation process has been set incorrectly, possibly due to user input or system configuration.
- Data Overlap: There may be overlapping data periods that are not allowed, leading to conflicts in scheduling.
- System Settings: The system may have specific settings or rules that prevent certain dates from being used for generation processes.
Solution:
- Check Date Inputs: Review the start date you have entered for the generation process. Ensure that it is set to a date that is equal to or later than the allowed date.
- Adjust Configuration: If the start date is being set programmatically or through a configuration, ensure that the logic correctly calculates the start date based on the allowed parameters.
- Review Scheduling Rules: Check the scheduling rules and constraints defined in the system to ensure that they align with your intended generation dates.
- Consult Documentation: Refer to the SAP documentation or help resources for specific guidelines on date configurations and scheduling in your version of SAP.
- Contact Support: If the issue persists, consider reaching out to SAP support or your internal IT team for further assistance.
Related Information:
By following these steps, you should be able to resolve the error and successfully configure the generation process in SAP.
Get instant SAP help. Start your 7-day free trial now.
/PM0/AB_IBC_CNFG_I_4101
Attribute &1 has no adjustment level; Attribute is orphaned
What causes this issue? The data supplied by msg.PM to the product tables is inconsistent. For the entry in table <AB>MSG/4_PATTRVAL</> (...
/PM0/AB_IBC_CNFG_I_4100
Relationship has no generation; Relation is orphaned
What causes this issue? The data supplied by msg.PM to the product tables is inconsistent. There is an entry in table <AB>/MSG/4_PREL</> ...
/PM0/AB_IBC_CNFG_I_4103
End date of generation &1 is later than &2
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
/PM0/AB_IBC_CNFG_I_4104
No adjustment level exists for generation
What causes this issue? Each generation in the product engine requires at least one adjustment level.System Response The system issues an error mess...
Click on this link to search all SAP messages.