Message type: E = Error
Message class: /PM0/3FW_CHK_MESS -
Message number: 047
Message text: No process node exists for process node variant &1 &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/3FW_CHK_MESS047
- No process node exists for process node variant &1 &2 ?The SAP error message /PM0/3FW_CHK_MESS047 No process node exists for process node variant &1 &2 typically indicates that the system is unable to find a specific process node variant that is referenced in your configuration or transaction. This can occur in various contexts, such as when working with process management, workflows, or specific applications within SAP.
Cause: Missing Process Node Variant: The specified process node variant does not exist in the system. This could be due to a configuration error or because the variant was deleted or not created. Incorrect Configuration: The process node variant might be incorrectly configured or referenced in a way that the system cannot resolve. Transport Issues: If the process node variant was recently transported from another system, it may not have been transported correctly or completely. Authorization Issues: Sometimes, the user may not have the necessary authorizations to access the process node variant.
Solution: Check Process Node Variants: Verify that the process
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/3FW_CHK_MESS046
No application exists for extension group &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/3FW_CHK_MESS045
No channel model node exists for attribute property &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/3FW_CHK_MESS048
No preceding link for strategy &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/3FW_CHK_MESS049
No application exists for transaction &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.