Message type: E = Error
Message class:  /PLMI/RTG_RCA_SCO -  
Message number: 052
Message text: Description of planning scope &2 in language &1 deleted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /PLMI/RTG_RCA_SCO052 indicates that a planning scope has been deleted in the system. This error typically arises in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) when the system is trying to access a planning scope that no longer exists.
Cause: Deletion of Planning Scope: The planning scope referenced in the error message has been deleted from the system. This could happen due to manual deletion by a user or as part of a data cleanup process. Configuration Changes: Changes in the configuration or settings related to planning scopes may lead to the deletion or unavailability of a specific planning scope. Transport Issues: If the planning scope was transported from one system to another (e.g., from development to production), and the transport did not include the planning scope, it may result in this error.
Solution: Check Planning Scope: Verify if the planning scope still exists in
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
/PLMI/RTG_RCA_SCO051 Error while creating assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/RTG_RCA_SCO050 Cannot start synchronization for an unsaved planning scope
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/RTG_RCA_SCO053 Description of scope &2 in language &1 will be deleted when you save
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/RTG_RCA_SCO054 Routing &1 was created with parameter effectivity
What causes this issue?  Routing &1& was maintained with parameter effectivity.System Response  Therefore, the routing cannot be used in the r...
Click on this link to search all SAP messages.