Message type: E = Error
Message class: /PLMI/RTG_RCA_SCO -
Message number: 047
Message text: Planning level &1 of planning scope &2 deleted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /PLMI/RTG_RCA_SCO047 Planning level &1 of planning scope &2 deleted typically indicates that a specific planning level within a planning scope has been deleted or is no longer available in the system. This can occur in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) when there are changes made to the planning levels or scopes.
Cause: Deletion of Planning Level: The planning level specified in the error message has been deleted from the planning scope. This could happen due to changes in the configuration or data model. Data Model Changes: If there have been recent changes to the data model or planning levels, it may lead to inconsistencies. Transport Issues: If changes were transported from one system to another (e.g., from development to production), and the planning level was not included in the transport, it could lead to this error.
Solution: Check Planning Levels: Verify the
Get instant SAP help. Sign up for our Free Essentials Plan.
/PLMI/RTG_RCA_SCO046
Planning levels are consistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/RTG_RCA_SCO045
Assignments are consistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/RTG_RCA_SCO048
Operation &1 is not an operation from current routing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/RTG_RCA_SCO049
Synchronization without assigned routings is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.