How To Fix /PLMI/RTG_RCA_SCO043 - Routing &1 is not assigned to planning scope &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PLMI/RTG_RCA_SCO -

  • Message number: 043

  • Message text: Routing &1 is not assigned to planning scope &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PLMI/RTG_RCA_SCO043 - Routing &1 is not assigned to planning scope &2 ?

    The SAP error message /PLMI/RTG_RCA_SCO043 indicates that a specific routing (identified by &1) is not assigned to the planning scope (identified by &2). This error typically occurs in the context of production planning and control, particularly when working with routing and planning scopes in SAP's Advanced Planning and Optimization (APO) or similar modules.

    Cause:

    1. Routing Not Assigned: The routing you are trying to use is not linked to the specified planning scope. This can happen if the routing was created or modified after the planning scope was defined.
    2. Planning Scope Configuration: The planning scope may not include the routing due to configuration settings or if the routing was created in a different context or plant.
    3. Data Consistency Issues: There may be inconsistencies in the master data, such as missing assignments or incorrect settings in the routing or planning scope.

    Solution:

    1. Check Routing Assignment:

      • Go to the routing transaction (e.g., CA01, CA02) and check if the routing is correctly assigned to the relevant planning scope.
      • Ensure that the routing is valid for the plant and production version you are working with.
    2. Assign Routing to Planning Scope:

      • If the routing is not assigned, you can assign it to the planning scope using the appropriate transaction (e.g., /SAPAPO/RTG for routing in APO).
      • Make sure to include the routing in the planning scope configuration.
    3. Review Planning Scope Settings:

      • Check the planning scope settings in the configuration (transaction /SAPAPO/SCOP or similar) to ensure that it includes the necessary routings.
      • If needed, modify the planning scope to include the routing.
    4. Data Consistency Check:

      • Perform a consistency check on the master data to identify any discrepancies that may be causing the issue.
      • Use transaction codes like /SAPAPO/MASTER_DATA to check for inconsistencies.
    5. Consult Documentation:

      • Refer to SAP documentation or help notes related to routing and planning scope for additional guidance on configuration and troubleshooting.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CA01 (Create Routing), CA02 (Change Routing), and /SAPAPO/RTG (Routing in APO).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles and Authorizations: Ensure that you have the necessary authorizations to make changes to routings and planning scopes.

    By following these steps, you should be able to resolve the error and ensure that the routing is properly assigned to the planning scope in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker