How To Fix /PLMI/RTG_RCA_SCO026 - Assignment &1 changed in planning scope &2


/PLMI/RTG_RCA_SCO026 - Overview

  • Message type: E = Error

  • Message class: /PLMI/RTG_RCA_SCO -

  • Message number: 026

  • Message text: Assignment &1 changed in planning scope &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PLMI/RTG_RCA_SCO026 - Details

  • The SAP error message /PLMI/RTG_RCA_SCO026 Assignment &1 changed in planning scope &2 typically indicates that there has been a change in the assignment of a planning object (like a resource, location, or product) within a specific planning scope. This can occur in scenarios involving planning and forecasting, particularly in SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).
    
    Cause: Data Changes: The assignment of the planning object has been modified, which could be due to manual changes, data uploads, or changes in master data. Planning Scope Configuration: The planning scope may have been altered, leading to inconsistencies in the assignments. Versioning Issues: If multiple versions of planning data are being used, changes in one version may not be reflected in another, causing conflicts. Locking Issues: If the planning object is being accessed or modified by multiple users or processes simultaneously, it may lead to conflicts.
    Solution: Review Changes: Check the change logs or history

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PLMI/RTG_RCA_SCO026 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant