Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/RTG_RCA_PSM -
Message number: 020
Message text: Planning level &1 is not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/RTG_RCA_PSM020
- Planning level &1 is not valid ?The SAP error message
/PLMI/RTG_RCA_PSM020 Planning level &1 is not valid
typically occurs in the context of SAP's planning and budgeting functionalities, particularly when working with the SAP Integrated Business Planning (IBP) or similar modules. This error indicates that the specified planning level (denoted by&1
) is not recognized or is invalid in the current context.Causes:
- Incorrect Planning Level: The planning level specified in the transaction or configuration does not exist in the system.
- Configuration Issues: The planning levels may not be properly configured in the system, or there may be inconsistencies in the planning area settings.
- Data Issues: The data being processed may reference a planning level that has been deleted or is not active.
- Authorization Issues: The user may not have the necessary authorizations to access the specified planning level.
Solutions:
- Verify Planning Level: Check the planning level specified in the error message. Ensure that it is correctly defined in the system and that you are using the correct identifier.
- Check Configuration: Review the configuration settings for the planning area or planning levels in the relevant transaction (e.g.,
/PLMI/RTG
for planning levels). Ensure that the planning level is active and correctly set up.- Data Validation: If the error occurs during data processing, validate the data being used to ensure it references valid planning levels.
- User Authorizations: Ensure that the user has the necessary authorizations to access the planning level. This may involve checking roles and permissions in the SAP system.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the planning levels and their configurations.
Related Information:
/PLMI/RTG
for planning level management.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and setup of your SAP environment.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/RTG_RCA_PSM010
No active simulation or no usage defined
What causes this issue? Assignments or planning level elements can only be created when the simulation of the planning scope is active and has a usag...
/PLMI/RTG_RCA_PSM007
Source material &1 different from aligned material &2 of assignment &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/RTG_RCA_PSM_SP001
Planning scope and product structure node must be completely specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/RTG_RCA_PSM_SP002
Planning scope must be completely specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.