How To Fix /PLMI/RTG_RCA_PSM003 - Planning scope &1 has no simulation assigned


/PLMI/RTG_RCA_PSM003 - Overview

  • Message type: E = Error

  • Message class: /PLMI/RTG_RCA_PSM -

  • Message number: 003

  • Message text: Planning scope &1 has no simulation assigned

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PLMI/RTG_RCA_PSM003 - Details

  • The SAP error message /PLMI/RTG_RCA_PSM003 Planning scope &1 has no simulation assigned typically occurs in the context of SAP's Integrated Business Planning (IBP) or similar planning applications. This error indicates that the specified planning scope does not have any simulation assigned to it, which is necessary for executing certain planning functions or analyses.
    
    Cause: No Simulation Assigned: The planning scope you are trying to use does not have any simulations linked to it. Simulations are necessary for running scenarios or analyses in the planning process.
    Configuration Issues: There may be a misconfiguration in the planning scope settings or the simulation settings. Data Integrity Issues: The planning scope might have been created or modified incorrectly, leading to the absence of a simulation.
    Solution: Assign a Simulation: Go to the planning scope configuration in your SAP system. Check the settings for the planning scope identified by &1. Ensure that at least one simulation is assigned to the planning scope. If not,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PLMI/RTG_RCA_PSM003 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author