How To Fix /PLMI/RTG_APP001 - Root BOM required when creating routing component assignments


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PLMI/RTG_APP -

  • Message number: 001

  • Message text: Root BOM required when creating routing component assignments

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PLMI/RTG_APP001 - Root BOM required when creating routing component assignments ?

    The SAP error message /PLMI/RTG_APP001 Root BOM required typically occurs when you are trying to create routing component assignments in the context of Production Planning (PP) or similar modules, and the system cannot find a valid Bill of Materials (BOM) for the material you are working with. This error indicates that a root BOM is required for the operation you are attempting to perform.

    Cause:

    1. Missing BOM: The primary cause of this error is that there is no BOM defined for the material in question. The system requires a root BOM to create routing component assignments.
    2. Incorrect BOM Status: The BOM may exist but could be inactive or not valid for the plant or production version you are working with.
    3. Incorrect Material Master Data: The material master data may not be set up correctly, leading to issues in finding the appropriate BOM.
    4. Plant-Specific Issues: The BOM might not be assigned to the specific plant where you are trying to create the routing.

    Solution:

    1. Check BOM Existence: Verify if a BOM exists for the material. You can do this by using transaction code CS03 (Display BOM) and entering the material number and plant.
    2. Create or Activate BOM: If no BOM exists, you will need to create one using transaction code CS01 (Create BOM). If a BOM exists but is inactive, you may need to activate it.
    3. Check BOM Validity: Ensure that the BOM is valid for the specific plant and production version you are working with. You can check this in the BOM details.
    4. Review Material Master: Check the material master data using transaction code MM03 (Display Material) to ensure that the material is correctly set up and linked to the appropriate BOM.
    5. Check Routing: Ensure that the routing you are trying to create component assignments for is correctly linked to the BOM.

    Related Information:

    • Transaction Codes:
      • CS01: Create BOM
      • CS02: Change BOM
      • CS03: Display BOM
      • MM03: Display Material
      • CA03: Display Routing
    • BOM Types: Understand the different types of BOMs (e.g., production BOM, sales BOM) and ensure you are using the correct type for your process.
    • Production Versions: If you are using production versions, ensure that the BOM is assigned to the correct production version for the material.
    • Documentation: Refer to SAP documentation or help files for more detailed information on BOM and routing processes.

    By following these steps, you should be able to resolve the /PLMI/RTG_APP001 Root BOM required error and successfully create routing component assignments.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker