How To Fix /PLMI/RTG_APP001 - Root BOM required when creating routing component assignments


/PLMI/RTG_APP001 - Overview

  • Message type: E = Error

  • Message class: /PLMI/RTG_APP -

  • Message number: 001

  • Message text: Root BOM required when creating routing component assignments

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PLMI/RTG_APP001 - Root BOM required when creating routing component assignments ?
    The SAP error message /PLMI/RTG_APP001 Root BOM required typically occurs when you are trying to create routing component assignments in the context of Production Planning (PP) or similar modules, and the system cannot find a valid Bill of Materials (BOM) for the material you are working with. This error indicates that a root BOM is required for the operation you are attempting to perform.
    
    Cause: Missing BOM: The primary cause of this error is that there is no BOM defined for the material in question. The system requires a root BOM to create routing component assignments. Incorrect BOM Status: The BOM may exist but could be inactive or not valid for the plant or production version you are working with. Incorrect Material Master Data: The material master data may not be set up correctly, leading to issues in finding the appropriate BOM. Plant-Specific Issues: The BOM might not be assigned to the specific plant where

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker