How To Fix /PLMI/RCP_SP004 - Valid-from date of change number must be lower or equal to rcp key date


/PLMI/RCP_SP004 - Overview

  • Message type: E = Error

  • Message class: /PLMI/RCP_SP -

  • Message number: 004

  • Message text: Valid-from date of change number must be lower or equal to rcp key date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PLMI/RCP_SP004 - Valid-from date of change number must be lower or equal to rcp key date ?
    The SAP error message /PLMI/RCP_SP004 indicates that there is an issue with the "valid-from" date of a change number in relation to the "rcp key date." This error typically arises in the context of change management or configuration management within SAP, particularly when dealing with change numbers in the context of the PLM (Product Lifecycle Management) module.
    
    Cause: The error occurs when the valid-from date of a change number is set to a date that is later than the specified RCP (Release Control Process) key date. The RCP key date is a reference date used in the system to determine the validity of changes, and it must be earlier than or equal to the valid-from date of the change number.
    Solution: To resolve this error, you can take the following steps: Check the Valid-From Date: Review the valid-from date of the change number you are trying to use. Ensure that it is set to a

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author