How To Fix /PLMI/PPE_VIP036 - &1 between &2 and &3 created


/PLMI/PPE_VIP036 - Overview

  • Message type: E = Error

  • Message class: /PLMI/PPE_VIP -

  • Message number: 036

  • Message text: &1 between &2 and &3 created

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PLMI/PPE_VIP036 - Details

  • The SAP error message /PLMI/PPE_VIP036 typically relates to issues in the SAP Production Planning and Execution (PP/PE) module, particularly concerning the planning and scheduling of production orders or operations. The message indicates that there is a problem with the planning process between two specified dates or times.
    
    Cause: The error message /PLMI/PPE_VIP036 can be triggered by several factors, including: Date/Time Conflicts: The planning period defined in the system may not align with the production order's start and end dates. Resource Availability: The resources (machines, labor, etc.) required for the production process may not be available during the specified time frame. Capacity Constraints: There may be capacity constraints that prevent the scheduling of operations between the specified dates. Incorrect Master Data: Issues with master data, such as incorrect routing, work center settings, or production versions, can lead to this error. Planning Parameters: Incorrect planning parameters or settings in the configuration can also cause this error.
    Solution: To resolve the error,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PLMI/PPE_VIP036 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author