Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/PPE_VIP -
Message number: 036
Message text: &1 between &2 and &3 created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/PPE_VIP036
- &1 between &2 and &3 created ?The SAP error message
/PLMI/PPE_VIP036
typically relates to issues in the SAP Production Planning and Execution (PP/PE) module, particularly concerning the planning and scheduling of production orders or operations. The message indicates that there is a problem with the planning process between two specified dates or times.Cause:
The error message
/PLMI/PPE_VIP036
can be triggered by several factors, including:
- Date/Time Conflicts: The planning period defined in the system may not align with the production order's start and end dates.
- Resource Availability: The resources (machines, labor, etc.) required for the production process may not be available during the specified time frame.
- Capacity Constraints: There may be capacity constraints that prevent the scheduling of operations between the specified dates.
- Incorrect Master Data: Issues with master data, such as incorrect routing, work center settings, or production versions, can lead to this error.
- Planning Parameters: Incorrect planning parameters or settings in the configuration can also cause this error.
Solution:
To resolve the error, consider the following steps:
- Check Dates: Verify the start and end dates of the production order or operation. Ensure they are correctly set and fall within the planning horizon.
- Review Resource Availability: Check the availability of resources (work centers, machines, etc.) during the specified time frame. Adjust the schedule if necessary.
- Analyze Capacity: Use transaction codes like CM01 or CM21 to analyze capacity and identify any constraints that may be causing the issue.
- Validate Master Data: Review the master data related to the production order, including routing, work centers, and production versions, to ensure they are correctly configured.
- Adjust Planning Parameters: If necessary, adjust the planning parameters in the configuration settings to align with the production requirements.
- Re-run Planning: After making the necessary adjustments, re-run the planning process to see if the error persists.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/PPE_VIP035
&1 &2 deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/PPE_VIP034
&1 &2 changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/PPE_VIP037
&1 between &2 and &3 changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/PPE_VIP038
&1 between &2 and &3 deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.