How To Fix /PLMI/PPE_VIP002 - Use Active Simulation and Validity Date could not be used together


/PLMI/PPE_VIP002 - Overview

  • Message type: E = Error

  • Message class: /PLMI/PPE_VIP -

  • Message number: 002

  • Message text: Use Active Simulation and Validity Date could not be used together

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PLMI/PPE_VIP002 - Details

  • The SAP error message /PLMI/PPE_VIP002 Use Active Simulation and Validity Date could not be used together typically occurs in the context of SAP's Product Lifecycle Management (PLM) or similar modules where simulations or planning scenarios are being executed. This error indicates a conflict between two settings: "Active Simulation" and "Validity Date."
    
    Cause: Active Simulation: This setting allows users to run simulations based on the current state of the data without affecting the actual data. It is often used for testing or planning purposes. Validity Date: This setting is used to specify a particular date for which the data should be valid. It is often used to analyze historical data or future projections based on a specific point in time. The error arises because the system does not allow both settings to be active simultaneously. When "Active Simulation" is selected, the system expects to work with the current data, while the "Validity Date" implies a

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PLMI/PPE_VIP002 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker