Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/MBOM_MAP_29 -
Message number: 176
Message text: Unit of measure &1 not allowed for material &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/MBOM_MAP_29176
- Unit of measure &1 not allowed for material &2 ?The SAP error message
/PLMI/MBOM_MAP_29176 Unit of measure &1 not allowed for material &2
typically indicates that there is an issue with the unit of measure (UoM) assigned to a specific material in the system. This error often arises in the context of manufacturing or production planning, particularly when working with Bill of Materials (BOM) or Material BOM mapping.Cause:
- Incorrect Unit of Measure: The unit of measure specified for the material does not match the allowed units defined in the material master data.
- Configuration Issues: The configuration settings for the material or the BOM may not allow the specified unit of measure.
- Material Master Data: The material master may not have the correct UoM settings, or the UoM may not be defined for the specific plant or storage location.
- BOM Settings: The BOM may have been set up with a different UoM than what is being used in the transaction.
Solution:
Check Material Master:
- Go to the material master record (transaction code
MM03
) for material&2
.- Verify the unit of measure settings in the Basic Data and Purchasing views.
- Ensure that the UoM
&1
is listed as an allowed unit of measure.Update BOM:
- If the BOM is using a different UoM, you may need to adjust the BOM (transaction code
CS02
) to ensure it aligns with the material's UoM.Configuration Review:
- Review the configuration settings in the customizing (transaction code
SPRO
) to ensure that the UoM settings are correctly defined for the relevant materials and BOMs.Create/Change UoM:
- If the UoM
&1
is not defined for the material, you may need to add it in the material master or change the UoM in the transaction you are trying to execute.Consult Documentation:
- Refer to SAP documentation or help resources for specific details on UoM settings and BOM configurations.
Related Information:
MM03
: Display Material MasterCS02
: Change BOMSPRO
: Customizing settingsBy following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/MBOM_MAP_29175
Unit of measure &1 not allowed for material &2 in plant &3
What causes this issue? You have entered a unit of measure for a component or variable-size item which is not defined.System Response The system iss...
/PLMI/MBOM_MAP_29149
Material group & different from material group & in material master
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CTM4300
*** Log Profile Settings ********************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CTM4301
Shift orders for sources of supply with name &1
What causes this issue? The planning parameter to shift orders to in-house production sources of supply, whose name starts with character string &quo...
Click on this link to search all SAP messages.