Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/GSS_SI2B -
Message number: 009
Message text: Unit of measure &1 of material &2 cannot be used to maintain routing &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/GSS_SI2B009
- Unit of measure &1 of material &2 cannot be used to maintain routing &3 ?The SAP error message
/PLMI/GSS_SI2B009
indicates that there is an issue with the unit of measure (UoM) associated with a material when trying to maintain a routing. This error typically arises in the context of production planning and routing in SAP, where the system expects a specific unit of measure for the material being used in the routing.Cause:
- Incompatible Unit of Measure: The unit of measure for the material specified in the routing does not match the expected unit of measure for that material in the context of the routing.
- Missing or Incorrect Configuration: The material may not be properly configured in the system, or the unit of measure may not be defined correctly in the material master.
- Routing Settings: The routing may be set up to use a different unit of measure than what is defined for the material.
Solution:
Check Material Master:
- Go to the material master record for the material in question (transaction code
MM03
).- Verify the units of measure defined for the material. Ensure that the base unit of measure and any alternative units of measure are correctly set up.
Review Routing:
- Check the routing (transaction code
CA03
) to see what unit of measure is being used.- Ensure that the routing is compatible with the unit of measure defined for the material.
Adjust Unit of Measure:
- If the unit of measure in the routing is incorrect, you may need to adjust it to match the unit of measure defined in the material master.
- If necessary, create or modify the unit of measure conversion factors in the material master.
Consult Configuration:
- If the issue persists, consult with your SAP configuration team to ensure that the settings for units of measure in the system are correctly configured.
Check for Customizations:
- If your organization has custom developments or enhancements, check if any custom logic is affecting the unit of measure handling.
Related Information:
MM03
: Display Material MasterCA03
: Display RoutingC223
: Maintain Unit of Measure ConversionBy following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/GSS_SI2B008
Unit of measure &1 not allowed for material &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/GSS_SI2B007
Specify change number for routing-MatBOM assignment &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/GSS_SI2B010
Synchronization successful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/GSS_SI2B011
Synch. of version &1 and &2 of routing-MatBOM assignment &3 not allowed
What causes this issue? You tried to synchronize two versions of the same routing component assignment at the same time.System Response The system w...
Click on this link to search all SAP messages.